Final report for the Sheridan hydropower study (Big Goose treated water pipeline), level II

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Final report for the Sheridan hydropower stud ...
HKM Engineering Inc.
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by Open Library Bot
December 5, 2010 | History

Final report for the Sheridan hydropower study (Big Goose treated water pipeline), level II

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

This edition doesn't have a description yet. Can you add one?

Publish Date
Publisher
HKM Engineering
Language
English

Buy this book

Book Details


Published in

Sheridan, Wyo

Edition Notes

Includes bibliographical references.
"October 2002."
Discusses the rehabilitation or replacement of the pipeline between the Big Goose Water Treatment Plant and the Airport Pump Station, and the feasibility of hydropower generation by the Sheridan Area Water System.

Other Titles
Sheridan hydropower study, Sheridan hydropower level II study

Classifications

Library of Congress
TD434 H55 2002

The Physical Object

Pagination
1 v. (various foliations) :

ID Numbers

Open Library
OL3731756M
LCCN
2003387853
OCLC/WorldCat
51279349

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
December 5, 2010 Edited by Open Library Bot Added subjects from MARC records.
December 10, 2009 Created by WorkBot add works page