Check nearby libraries
Buy this book

This edition doesn't have a description yet. Can you add one?
Check nearby libraries
Buy this book

Edition | Availability |
---|---|
1
Final report for Hidden Valley pipeline level II feasibility study
2003, Anderson Consulting Engineers
in English
|
aaaa
|
Book Details
Table of Contents
Introduction
Scoping and project meetings
Structure inventory and assessment
Seepage investigation
Irrigation efficiency analysis
Rehabilitation plan
Conceptual designs and cost estimes
Permitting requirements
Funding sources
Conclusions and recommendations
App. A. Field inventory tables
App. B. Cost estimate documentation.
Edition Notes
Project performed for the Midvale Irrigation District which services the Riverton Unit of the Pick-Sloan Missouri Basin Program.
"November 17, 2003."
Project evaluates replacing the existing open ditch system with a presurized pipe system, and the potential of a re-regulation reservoir to better manage deliveries and operational waste.
Classifications
The Physical Object
Edition Identifiers
Work Identifiers
Community Reviews (0)
History
- Created April 1, 2008
- 4 revisions
Wikipedia citation
×CloseCopy and paste this code into your Wikipedia page. Need help?
December 10, 2020 | Edited by MARC Bot | import existing book |
August 14, 2010 | Edited by WorkBot | merge works |
December 12, 2009 | Edited by WorkBot | link works |
April 1, 2008 | Created by an anonymous user | Imported from Scriblio MARC record |