Final report for Hidden Valley pipeline level II feasibility study

Final report for Hidden Valley pipeline level ...
Anderson Consulting Engineers. ...
Locate

My Reading Lists:

Create a new list



Buy this book

Last edited by MARC Bot
December 10, 2020 | History

Final report for Hidden Valley pipeline level II feasibility study

This edition doesn't have a description yet. Can you add one?

Publish Date
Language
English

Buy this book

Book Details


Table of Contents

Introduction
Scoping and project meetings
Structure inventory and assessment
Seepage investigation
Irrigation efficiency analysis
Rehabilitation plan
Conceptual designs and cost estimes
Permitting requirements
Funding sources
Conclusions and recommendations
App. A. Field inventory tables
App. B. Cost estimate documentation.

Edition Notes

Project performed for the Midvale Irrigation District which services the Riverton Unit of the Pick-Sloan Missouri Basin Program.
"November 17, 2003."
Project evaluates replacing the existing open ditch system with a presurized pipe system, and the potential of a re-regulation reservoir to better manage deliveries and operational waste.

Published in
Fort Collins, CO
Other Titles
Hidden Valley pipeline level II feasibility study

Classifications

Library of Congress
TC824.W8 A83 2003

The Physical Object

Pagination
1 v. (various pagings) :

Edition Identifiers

Open Library
OL3350540M
LCCN
2004368900
OCLC/WorldCat
54011298

Work Identifiers

Work ID
OL5775014W

Community Reviews (0)

No community reviews have been submitted for this work.

Lists

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
December 10, 2020 Edited by MARC Bot import existing book
August 14, 2010 Edited by WorkBot merge works
December 12, 2009 Edited by WorkBot link works
April 1, 2008 Created by an anonymous user Imported from Scriblio MARC record