An edition of Defense acquisitions (2005)

Defense acquisitions

Navy faces challenges constructing the aircraft carrier Gerald R. Ford within budget : report to the Ranking Minority Member, Subcommittee on Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives.

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Defense acquisitions
United States. Government Acco ...
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by WorkBot
August 13, 2010 | History
An edition of Defense acquisitions (2005)

Defense acquisitions

Navy faces challenges constructing the aircraft carrier Gerald R. Ford within budget : report to the Ranking Minority Member, Subcommittee on Seapower and Expeditionary Forces, Committee on Armed Services, House of Representatives.

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

As a result of a substantial investment of time and money, the Navy has reduced the risks associated with a number of essential technologies, including the nuclear propulsion and electric plant. At this time, several technical risks that could lead to increased construction costs and potentially result in capability reductions still remain. In particular, the electromagnetic aircraft launch system (EMALS), the advanced arresting gear, and the dual band radar face key tests with little margin for resolving problems before they begin to disrupt the optimal CVN 78 construction schedule and increase ship costs. If key systems arrive late, more labor cost may be incurred because of inefficient work-arounds and schedule delays. EMALS and the advanced arresting gear are vital to meeting key capabilities and must be delivered to the shipyard on time to maintain the construction schedule. The dual band radar enables a smaller island structure on the deck of the carrier, facilitating the ship's increased sortie generation rate. All three systems have experienced schedule delays because of technical and other challenges.

Publish Date
Language
English
Pages
52

Buy this book

Edition Availability
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions

Add another edition?

Book Details


Edition Notes

"August 2007."

Cover title.

"GAO-07-866."

Includes bibliographical references.

Also available via the World Wide Web.

Published in
[Washington, D.C.]
Other Titles
Navy faces challenges constructing the aircraft carrier Gerald R. Ford within budget

Classifications

Dewey Decimal Class
359.9/4835
Library of Congress
VC260 .U57 2007

The Physical Object

Pagination
ii, 52 p. :
Number of pages
52

ID Numbers

Open Library
OL22841803M
LCCN
2007473364

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
August 13, 2010 Edited by WorkBot merge works
December 15, 2009 Edited by WorkBot link works
January 7, 2009 Created by ImportBot Imported from Library of Congress MARC record