An edition of Defense acquisitions (2005)

Defense acquisitions

plans need to allow enough time to demonstrate capability of first littoral combat ships : report to Congressional Committees

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Defense acquisitions
United States. Government Acco ...
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by MARC Bot
December 11, 2020 | History
An edition of Defense acquisitions (2005)

Defense acquisitions

plans need to allow enough time to demonstrate capability of first littoral combat ships : report to Congressional Committees

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

As a result of a substantial investment of time and money, the Navy has reduced the risks associated with a number of essential technologies, including the nuclear propulsion and electric plant. At this time, several technical risks that could lead to increased construction costs and potentially result in capability reductions still remain. In particular, the electromagnetic aircraft launch system (EMALS), the advanced arresting gear, and the dual band radar face key tests with little margin for resolving problems before they begin to disrupt the optimal CVN 78 construction schedule and increase ship costs. If key systems arrive late, more labor cost may be incurred because of inefficient work-arounds and schedule delays. EMALS and the advanced arresting gear are vital to meeting key capabilities and must be delivered to the shipyard on time to maintain the construction schedule. The dual band radar enables a smaller island structure on the deck of the carrier, facilitating the ship's increased sortie generation rate. All three systems have experienced schedule delays because of technical and other challenges.

Publish Date
Language
English
Pages
44

Buy this book

Edition Availability
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions
Cover of: Defense acquisitions

Add another edition?

Book Details


Edition Notes

"March 2005."

"GAO-05-255."

Published in
Washington, D.C
Other Titles
Plans need to allow enough time to demonstrate capability of first littoral combat ships, Littoral combat ships, report to Congressional Committees

Classifications

Library of Congress
V883 .U65 2005

The Physical Object

Pagination
ii, 44 p. :
Number of pages
44

ID Numbers

Open Library
OL16254181M
LCCN
2005364015

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
December 11, 2020 Edited by MARC Bot import existing book
August 13, 2010 Edited by WorkBot merge works
December 15, 2009 Edited by WorkBot link works
October 28, 2008 Edited by ImportBot Found a matching Library of Congress MARC record
September 22, 2008 Created by ImportBot Imported from Library of Congress MARC record