100-kW metal wind turbine blade basic date, loads and stress analysis

100-kW metal wind turbine blade basic date, l ...
A. W. Cheritt, A. W. Cheritt
Locate

My Reading Lists:

Create a new list



Buy this book

Last edited by WorkBot
December 15, 2009 | History

100-kW metal wind turbine blade basic date, loads and stress analysis

This edition doesn't have a description yet. Can you add one?

Buy this book

Edition Availability
Cover of: 100-kW metal wind turbine blade basic date, loads and stress analysis
100-kW metal wind turbine blade basic date, loads and stress analysis
1975, Dept. of Energy, Division of Solar Energy, for sale by the National Technical Information Service
in English
Cover of: 100-kW metal wind turbine blade basic date, loads and stress analysis
100-kW metal wind turbine blade basic date, loads and stress analysis
1975, Dept. of Energy, Division of Solar Energy, for sale by the National Technical Information Service
in English

Add another edition?

Book Details


Edition Notes

Contract NAS 3-19235.

"Lockhead LR 27153."

Bibliography: p. 2-12.

Published in
[Washington], Springfield, Va
Series
DOE/NASA ; 9235-75/1, NASA contractor report ; NASA CR-134956, NASA contractor report -- NASA CR-134956., DOE/NASA -- 9235-75/1.

The Physical Object

Pagination
233 p. in various pagings :
Number of pages
233

Edition Identifiers

Open Library
OL15226950M

Work Identifiers

Work ID
OL11462277W

Community Reviews (0)

No community reviews have been submitted for this work.

Lists

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
December 15, 2009 Edited by WorkBot link works
September 18, 2008 Created by ImportBot Imported from Oregon Libraries MARC record