Click here to skip to this page's main content.

New to the Open Library? — Learn how it works
Last edited by Open Library Bot
December 5, 2010 | History

City of Cheyenne Board of Public Utilities hydropower feasibility study, level II project 1 edition

City of Cheyenne Board of Public Utilities hydropower feasibility stud ...
ECI (Firm)

Read

No readable version available.

Buy

Add an ISBN to link to booksellers

Lists

You could add City of Cheyenne Board of Public Utilities hydropower feasibility study, level II project to a list if you log in.
There is only 1 edition record, so we'll show it here...  •  Add edition?

City of Cheyenne Board of Public Utilities hydropower feasibility study, level II project
final report
submitted to the Wyoming Water Development Commission and the Board of Public Utilities ; submitted by ECI in association with NEI Electric Power Engineering, Inc. and AVI.

Published 2003 by ECI in [Greenwood Village, CO] .
Written in English.

Edition Notes

Includes bibliographical references.
The study covers the entire BOPU system from Hog Park Reservoir to the pressure reducing valves in Cheyenne itself.

Other Titles
Cheyenne hydropower feasibility study, level II :

Classifications

Dewey Decimal Class
333.91/40978719
Library of Congress
TK1424.W8 E33 2003

The Physical Object

Pagination
1 v. (various foliations) : "October 2003."
Number of pages
2003

ID Numbers

Open Library
OL3350538M
LC Control Number
2004368898
OCLC/WorldCat
54012476

History Created December 10, 2009 · 2 revisions Download catalog record: RDF / JSON

December 5, 2010 Edited by Open Library Bot Added subjects from MARC records.
December 10, 2009 Created by WorkBot add works page