Using an energy performance based design-build process to procure a large scale low-energy building

preprint

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Using an energy performance based design-buil ...
Shanti D. Pless
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by MARC Bot
December 13, 2022 | History

Using an energy performance based design-build process to procure a large scale low-energy building

preprint

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

This paper will review a novel procurement, acquisition, and contract process of a large-scale replicable net zero energy (ZEB) office building. The owners (who are also commercial building energy efficiency researchers) developed and implemented an energy performance based design-build process to procure a 220,000 ft2 office building with contractual requirements to meet demand side energy and LEED goals. We will outline the key procurement steps needed to ensure achievement of our energy efficiency and ZEB goals using a replicable delivery process. The development of a clear and comprehensive Request for Proposal (RFP) that includes specific and measurable energy use intensity goals is critical to ensure energy goals are met in a cost effective manner. The RFP includes a contractual requirement to meet an absolute demand side energy use requirement of 25 kBtu/ft2, with specific calculation methods on what loads are included, how to normalize the energy goal based on increased space efficiency and data center allocation, specific plug loads and schedules, and calculation details on how to account for energy used from the campus hot and chilled water supply. The RFP also provides for stretch goals, such as reaching net-zero energy. Additional advantages of integrating energy requirements into this procurement process include leveraging the voluntary incentive program, which is a financial incentive based on how well the owner feels the design-build team is meeting the RFP goals.

Publish Date
Language
English

Buy this book

Edition Availability
Cover of: Using an energy performance based design-build process to procure a large scale low-energy building

Add another edition?

Book Details


Edition Notes

Title from title screen (viewed June 6, 2011).

"May 2011."

"Presented at the ASHRAE Winter Conference, Las Vegas, Nevada, January 29-February 2, 2011."

Includes bibliographical references (p. 8-9).

DE-AC36-08GO28308

Full text available via Internet in .pdf format. Adobe Acrobat Reader required.

Published in
Golden, Colo.]
Series
NREL/CP -- 5500-51323, Conference paper (National Renewable Energy Laboratory (U.S.)) -- 5500-51323.

The Physical Object

Format
[electronic resource] :
Pagination
1 online resource (9 p.)

ID Numbers

Open Library
OL43926328M
OCLC/WorldCat
729271752

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
December 13, 2022 Created by MARC Bot import new book