An edition of Defense infrastructure (2009)

Defense infrastructure

further actions needed to support Air Force electronic warfare evaluation simulator relocation plans

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Defense infrastructure
Brian J. Lepore
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by MARC Bot
December 13, 2022 | History
An edition of Defense infrastructure (2009)

Defense infrastructure

further actions needed to support Air Force electronic warfare evaluation simulator relocation plans

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

According to Department of Defense (DOD) officials, the Air Force Electronic Warfare Evaluation Simulator (the Simulator), located at Air Force Plant 4 in Fort Worth, Texas, is an important asset for helping to protect U.S. and allied pilots and aircraft against the missile threats posed by adversaries. The Simulator at Plant 4 is one of only two Air Force facilities of its kind that test countermeasures against heat-seeking missiles, and it is the only Air Force facility that currently houses the equipment necessary to test countermeasures against more sophisticated radio frequency surface-to-air missiles. Although the Simulator equipment and facility are government owned and managed, they have been operated by Lockheed Martin since 1958.

However, as part of a larger Air Force initiative to consolidate and streamline test and evaluation activities, the Air Force is planning to terminate the Simulator contractor operations in Texas; relocate its six radio frequency threat simulators to Wright- Patterson Air Force Base, Ohio; and redirect infrared test work to Eglin Air Force Base, Florida. Both proposed receiving locations currently have other government-operated electronic warfare test facilities. The Air Force considers the infrared capabilities at Plant 4 in Texas and at the Eglin facility redundant, and Eglin's facility has been utilized at a higher rate than the Simulator at Plant 4 over the last several years. In light of this lower utilization at Plant 4, the Air Force has placed the Simulator's infrared test equipment in on-site storage.

It does not consider moving the Simulator's infrared test configuration essential to current mission needs, but would prefer to do so to potentially reuse this test equipment at Eglin. According to Air Force officials, this relocation proposal would reduce costs; result in critical technical advantages, such as higher-fidelity testing; and provide them with more operational control over these testing and evaluation assets. Our objectives for this review were to determine (1) to what extent OSD's report on the proposed relocation of the Air Force Electronic Warfare Evaluation Simulator includes a comprehensive cost-benefit analysis and (2) to what extent OSD has addressed the technical issues involved in the proposed relocation.

Publish Date
Language
English
Pages
22

Buy this book

Edition Availability
Cover of: Defense infrastructure
Cover of: Defense infrastructure
Cover of: Defense infrastructure
Defense infrastructure: Department of Defense renewable energy initiatives
2010, U.S. Govt. Accountability Office
electronic resource : in English
Cover of: Defense infrastructure
Cover of: Defense infrastructure
Defense infrastructure: Department of Defense's energy supplemental report
2010, U.S. Govt. Accountability Office
electronic resource : in English
Cover of: Defense infrastructure

Add another edition?

Book Details


Edition Notes

Title from p.1 screen (viewed Feb. 7, 2011).

"January 26, 2011."

"GAO-11-123R."

Includes bibliographical references.

Mode of access: World Wide Web.

System requirements: Adobe Reader.

Published in
Washington, DC
Other Titles
Further actions needed to support Air Force electronic warfare evaluation simulator relocation plans

The Physical Object

Format
[electronic resource] :
Pagination
1 online resource (22 p.)
Number of pages
22

ID Numbers

Open Library
OL43927408M
OCLC/WorldCat
700961891

Work Description

This briefing is in response to section 2846 of the National Defense Authorization Act for Fiscal Year 2010. The act required the Comptroller General to report on the Department of Defense's renewable energy initiatives, including projects involving the installation of solar panels.

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
December 13, 2022 Created by MARC Bot import new book