A construction scheduling technique is presented which is, in many cases, more advantageous, to both the contractor & the owner, than bar charts typically provided by contractors, particularly for projects that are linear in nature or have repetitive activities scheduled in phases (e.g. roads, piping systems, bridge spans, and high rise buildings). The technique is labeled the linear scheduling method because it is most useful in the construction industry for projects that are linear in nature. The technique maps planned or actual works along the length, or stations, of a project versus time. The basic application of this method is described. Examples of practical application are provided, including a comparative analysis based on an actual Florida Department of Transportation construction project. The technique is compared to the more prevalent bar chart technique utilized in such software applications as Primavera Project Planner.
Buy this book
Previews available in: English
Showing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
An analysis of the use of Linear Scheduling Techniques in the construction industry
1998, Available from National Technical Information Service
in English
|
aaaa
|
Book Details
Edition Notes
Thesis (Masters of Engineering) University of Florida, June 1998.
Includes bibliographical references (leaves (8-1-8-2))
Also available online.
System requirements: Adobe Acrobat reader.
dk/dk cc:9116 9/1/98.
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?January 31, 2012 | Edited by ImportBot | import new book |
January 27, 2012 | Created by ImportBot | import new book |