Central artery i-93/tunnel (i-90) project: central artery (kneeland - congress) design contract d001a preliminary design report. (draft).

Preview

Only you can see this

Save Note

Download Options

Last edited by ImportBot
August 2, 2012 | History

Central artery i-93/tunnel (i-90) project: central artery (kneeland - congress) design contract d001a preliminary design report. (draft).

...includes information on the original survey, geology of the area, civil and structural design, construction impact, architecture, landscape, urban design, storm drainage, utility relocations, mechanical and electrical systems, operations and maintenance, right-of-way impacts, traffic engineering, environmental issues, construction staging and traffic management, etc.; a copy of this item was in the BRA collection...

Publish Date
Language
English
Pages
82

Previews available in: English

Book Details


The Physical Object

Pagination
82 p. + appendices, maps; illus.
Number of pages
82

Edition Identifiers

Open Library
OL23285436M
Internet Archive
centralarteryi9391bech

Work Identifiers

Work ID
OL13788489W

Source records

Community Reviews (0)

No community reviews have been submitted for this work.

Lists

Download catalog record: RDF / JSON