Phase II screening studies, final report SKP A, WPP If Berma

structure planning (phase II) and detailed engineering planning (phase III) for transmigration settlement package H-Irian Jaya

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Phase II screening studies, final report SKP ...
PRC Engineering Consultants
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by MARC Bot
May 26, 2023 | History

Phase II screening studies, final report SKP A, WPP If Berma

structure planning (phase II) and detailed engineering planning (phase III) for transmigration settlement package H-Irian Jaya

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

This edition doesn't have a description yet. Can you add one?

Publish Date
Language
English
Pages
67

Buy this book

Book Details


Edition Notes

At head of title: Republic of Indonesia, Directorate of Planning and Programming, Directorate General of Settlement Preparation, Ministry of Transmigration.

"February 1986."

Bibliography: p. 64-67.

s 1987 ii n.

Published in
Jayapura, Irian Jaya
Other Titles
Phase 2 screening studies, final report SKP A, WPP If Berma, Phase two screening studies, final report SKP A, WPP If Berma

The Physical Object

Pagination
viii, S-3, 67, [26] p.
Number of pages
67

ID Numbers

Open Library
OL47950109M
LCCN
86946345
OCLC/WorldCat
20463242

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
May 26, 2023 Created by MARC Bot Imported from harvard_bibliographic_metadata record