Gateway West Transmission Line Project [draft supplemental] environmental impact statement

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read


Download Options

Buy this book

Last edited by ImportBot
June 29, 2016 | History

Gateway West Transmission Line Project [draft supplemental] environmental impact statement

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

On May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), collectively known as the Proponents, applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original application was revised in October 2007, August 2008, May 2009, and January 2010 to reflect changes and refinements in their proposed Project and in response to feedback from the public regarding routing alternatives. The Plan of Development (POD) has been revised several times in response to Project changes and recommendations from the BLM, other reviewing agencies, and public comment. This supplemental environmental impact statement (SEIS) evaluates the revised proposed action for Segments 8 and 9 as stated in the application including environmental protection measures. It also examines the environmental impacts of four other route alignments and two route variations. The BLM has identified seven action alternatives, two of which have been selected as Co-Preferred Alternatives by the BLM. Granting of the ROW for the Revised Proposed Routes or other route alignments would require amendments to BLM Resource Management Plans and BLM Management Framework Plans. Proposed amendments have been identified. Significant impacts were identified from construction and operations of the transmission line on historical resources (historic trails), visual quality, and cumulative impacts on several resources based on past and present levels of disturbance. A framework for compensatory mitigation has been added.

Buy this book

Previews available in: English

Edition Availability
Cover of: Gateway West Transmission Line Project [draft supplemental] environmental impact statement
Gateway West Transmission Line Project [draft supplemental] environmental impact statement
2016, U.S. Department of the Interior, Bureau of Land Management, Idaho State Office
in English

Add another edition?

Book Details


Table of Contents

Volume 1: Chapters 1 through 7
volume 2: Appendices B, C, F, G, H, I J, and K
volume 3: Large format appendices (appendices A, D, and E)

Edition Notes

"March 2016"--Cover.

Volume 3 is large format and measures 24cm. x 44 cm.

"BLM/ID/PL-15/100"--Preliminary page.

Published in
Boise, Idaho]
Other Titles
Draft supplemental impact statement for segments 8 and 9 of the Gateway West Transmission Line Project.

The Physical Object

Pagination
3 volumes (various pagings) :

ID Numbers

Open Library
OL25925551M
Internet Archive
gatewaywesttrans01unit
OCLC/WorldCat
945658243

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
June 29, 2016 Edited by ImportBot import new book
June 25, 2016 Edited by ImportBot import new book
June 17, 2016 Created by ImportBot Imported from Internet Archive item record