Draft plan amendment & draft environmental impact statement, environmental impact report for the Alta East Wind Project

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read


Download Options

Buy this book

Last edited by MARC Bot
August 30, 2021 | History

Draft plan amendment & draft environmental impact statement, environmental impact report for the Alta East Wind Project

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Granite Wind LLC, the Applicant, is proposing to develop an up to 84-megawatt wind energy plant and associated facilities on about 100 acres within a larger 2,756-acre area that includes 2,086 acres of public lands administered by the BLM Barstow Field Office and 670 acres of privately-owned land under the County of San Bernardino land-use jurisdiction. The site of the Proposed Action is located on unincorporated land in the Mojave Desert, approximately six miles east of the Town of Apple Valley and five miles northwest of the unincorporated community of Lucerne Valley, on the central ridge of the Granite Mountains. Also included in the proposal are a new access road to the project site, a new transmission line from the project site to an existing 220kV Southern California Edison (SCE) transmission line located in a utility corridor east of the site, and a new approximately 10-acre electrical substation (Jasper Substation) at the site of the SCE interconnection. In addition, the proposal includes an amendment to the CDCA Plan that would designate the proposed site as suitable for wind energy generation and allow for Siting of approximately 1 mile of the new 3.2-to 4.7-mile transmission line from the project site to be located outside of a utility corridor.

Buy this book

Previews available in: English

Edition Availability
Cover of: Draft plan amendment & draft environmental impact statement, environmental impact report for the Alta East Wind Project

Add another edition?

Book Details


Table of Contents

Volume 1: chapters 1 through 3
volume 2: chapters 4 through appendix A
volume 3: appendices B through D-14
volume 4: appendices D-15 through D-31
volume 5: appendices E through Q.

Edition Notes

"DES 12-18"

"June 2012"

"SCH No. 2011071051"

Includes bibliographic references and index.

Published in
Bakersfield, Calif
Other Titles
Draft plan amendment and draft environmental impact statement, environmental impact report for the Alta East Wind Project, Alta East Wind Project

The Physical Object

Pagination
5 volumes :

ID Numbers

Open Library
OL25912252M
Internet Archive
draftplanamendme05alta
OCLC/WorldCat
900083293

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
August 30, 2021 Edited by MARC Bot import existing book
August 30, 2021 Edited by MARC Bot import existing book
April 20, 2021 Edited by ImportBot import existing book
September 11, 2020 Edited by ImportBot import existing book
April 30, 2016 Created by ImportBot Imported from Internet Archive item record