Buy this book
![Loading indicator](/images/ajax-loader-bar.gif)
Last edited by Open Library Bot
December 3, 2010 | History
This edition doesn't have a description yet. Can you add one?
Publisher
Electric Power Research Institute
Buy this book
![Loading indicator](/images/ajax-loader-bar.gif)
Showing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
Green Mountain Power wind power project development: U.S. Department of Energy-EPRI wind turbine verification program
Publish date unknown, Electric Power Research Institute
|
aaaa
|
Book Details
Table of Contents
3. Site selection and land acquisition
4. Permitting and environmental studies
5. Turbine vendor selection
6. Project design, engineering and construction
7. Turbine testing and acceptance
8. Project cost and schedule
9. Operator, maintenance and performance evaluation plan.
Edition Notes
"TR-109061."
"Final report, December 1997."
"Prepared for Electric Power Research Institute."
Includes bibliographical references.
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?December 3, 2010 | Edited by Open Library Bot | Added subjects from MARC records. |
January 22, 2010 | Edited by WorkBot | add more information to works |
December 11, 2009 | Created by WorkBot | add works page |