It looks like you're offline.
Open Library logo
additional options menu

MARC record from Internet Archive

LEADER: 02995nam 2200685 a 4500
001 ocn429667820
003 OCoLC
005 20100714112438.6
006 m b
007 cr cga---uuuuu
008 090807s1975 cau bt f000 0 eng d
035 $a
035 $a
037 $aADA016575$bDTI
040 $aAD#$cAD#$dAD#
049 $aAD#A
086 0 $aD 208.14/2:NPS-55Z075051
088 $aNPS-55Z075051
100 1 $aSovereign, Michael G.
245 10 $aEscalation provisions for Navy contracts issues and choices /$cby Michael G. Sovereign and Carl R. Jones.
260 $aMonterey, Calif. :$bNaval Postgraduate School,$c1975.
300 $a51 p. ;$c28 cm.
500 $aTitle from cover.
500 $a"Prepared for: Chief of Naval Research, Arlington, Virginia 22217"--Cover.
500 $a"May 1975"--Cover.
500 $a"NPS-55Zo75051"--Cover.
500 $aAuthor(s) subject terms: Inflation, escalation, price index, contingency price, shipbuilding cost, aircraft cost, contract provisions.
504 $aIncludes bibliographical references (p. 47)
506 $a"Approved for public release; distribution unlimited"--Cover.
513 $aTechnical report; 1975.
520 $aThis paper begins with the identification and exposition of the four major issues involved in escalation for Navy contracts. These issues are: why is the change in input prices a particular problem for Navy contracts? Why is escalation a good procedure for dealing with the problem? What are the possible side effects of using escalation procedures? How is the trade-off between administrative cost, accuracy and contractor incentives (moral hazard) reached? For each separate issue as well as for the set of interrelated issues a discussion indicating its general applicability as well as its specific applicability to individual case is given. After the issues discussion the area of implementation of escalation is considered as a series of four questions: What prices should be covered? How should the price changes be measured? When should the measurements be made? How should the price changes be compensated? These questions are given general answers in each case and the set of questions as a whole is also considered. (Author)
610 10 $aUnited States.$bNavy$xProcurement.
650 0 $aInflation (Finance)
650 0 $aEscalator clause.
650 0 $aDefense contracts.
700 1 $aJones, Carl R.
710 2 $aNaval Postgraduate School (U.S.)
994 $aC0$bAD#
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
035 $a
949 $lgen$nL$aHG229$b.S7$s1$tnorm$u00001$i32768001788458
926 $aNPS-LIB$bDIGIPROJ$cD 208.14/2:NPS-55ZO75051$dTECH_RPT$eNEVER$f1