Click here to skip to this page's main content.

New to the Open Library? — Learn how it works
Last edited by Open Library Bot
December 5, 2010 | History

Final report for the Sheridan hydropower study (Big Goose treated water pipeline), level II 1 edition

Final report for the Sheridan hydropower study (Big Goose treated wate ...
HKM Engineering Inc.

Read

No readable version available.

Buy

Add an ISBN to link to booksellers

Lists

You could add Final report for the Sheridan hydropower study (Big Goose treated water pipeline), level II to a list if you log in.
There is only 1 edition record, so we'll show it here...  •  Add edition?

Final report for the Sheridan hydropower study (Big Goose treated water pipeline), level II
prepared for Wyoming Water Development Commission ; prepared by HKM Engineering Inc.

Published 2002 by HKM Engineering in Sheridan, Wyo .
Written in English.

Edition Notes

Includes bibliographical references.
"October 2002."
Discusses the rehabilitation or replacement of the pipeline between the Big Goose Water Treatment Plant and the Airport Pump Station, and the feasibility of hydropower generation by the Sheridan Area Water System.

Other Titles
Sheridan hydropower study, Sheridan hydropower level II study

Classifications

Library of Congress
TD434 H55 2002

The Physical Object

Pagination
1 v. (various foliations) :

ID Numbers

Open Library
OL3731756M
LC Control Number
2003387853
OCLC/WorldCat
51279349

History Created December 10, 2009 · 2 revisions
Download catalog record: RDF / JSON

December 5, 2010 Edited by Open Library Bot Added subjects from MARC records.
December 10, 2009 Created by WorkBot add works page