Final report for Hidden Valley pipeline level II feasibility study 1 edition

Final report for Hidden Valley pipeline level II feasibility study
Anderson Consulting Engineers.

Read

No readable version available.

Buy

Add an ISBN to link to booksellers

Lists

You could add Final report for Hidden Valley pipeline level II feasibility study to a list if you log in.
There is only 1 edition record, so we'll show it here...  •  Add edition?

Final report for Hidden Valley pipeline level II feasibility study
prepared for Wyoming Water Development Commission ; prepared by Anderson Consulting.

Published 2003 by Anderson Consulting Engineers in Fort Collins, CO .
Written in English.

Table of Contents

Introduction
Scoping and project meetings
Structure inventory and assessment
Seepage investigation
Irrigation efficiency analysis
Rehabilitation plan
Conceptual designs and cost estimes
Permitting requirements
Funding sources
Conclusions and recommendations
App. A. Field inventory tables
App. B. Cost estimate documentation.

Edition Notes

Project performed for the Midvale Irrigation District which services the Riverton Unit of the Pick-Sloan Missouri Basin Program.
"November 17, 2003."
Project evaluates replacing the existing open ditch system with a presurized pipe system, and the potential of a re-regulation reservoir to better manage deliveries and operational waste.

Other Titles
Hidden Valley pipeline level II feasibility study

Classifications

Library of Congress
TC824.W8 A83 2003

The Physical Object

Pagination
1 v. (various pagings) :

ID Numbers

Open Library
OL3350540M
LC Control Number
2004368900
OCLC/WorldCat
54011298

History Created December 10, 2009 · 2 revisions
Download catalog record: RDF / JSON

August 14, 2010 Edited by WorkBot merge works
December 10, 2009 Created by WorkBot add works page