Click here to skip to this page's main content.

New to the Open Library? — Learn how it works
Last edited by WorkBot
January 29, 2010 | History

Performance of a skewed semi-integral bridge 1 edition

Performance of a skewed semi-integral bridge
Edward J. Hoppe

Read

No readable version available.

Borrow

Try a WorldCat search?

Buy

Add an ISBN to link to booksellers

Lists

You could add Performance of a skewed semi-integral bridge to a list if you log in.
D'oh. There's no description for this book yet. Can you help?
There is only 1 edition record, so we'll show it here...  •  Add edition?

Performance of a skewed semi-integral bridge
volume 1 : field monitoring
Edward J Hoppe, Timothy M. Bagnall.

Published 2008 by Virginia Transportation Research Council in Charlottesville, Va .
Written in English.

About the Book

This project was developed to enhance the Virginia Department of Transportation's (VDOT) in-house expertise in the design of integral bridges and to provide a resource for consultants performing design work for VDOT. It involved extensive field monitoring of a highly skewed semi-integral (integral backwall) structure. The main purpose was to provide feedback regarding some of the assumptions behind the recently adopted set of integral bridge design guidelines, ultimately leading to reduced construction and maintenance expenses for VDOT. The project was focused on the long-term monitoring of a skewed semi-integral bridge located on Route 18 over Blue Springs Run in Alleghany County, Virginia. This report presents the results and analysis of field data acquired from various sensors between October 19, 2006 (shortly after the bridge was completed), and March 24, 2008. The results to date indicate satisfactory field performance, with a need for further monitoring. The main reason for constructing jointless bridges is to eliminate recurring maintenance costs associated with deteriorated bearings and spalled beam ends, commonly encountered with conventional structures. It is estimated that these maintenance expenses amount to approximately $366,000 per year in Virginia. In the past 7 years, integral bridges constituted between 10% and 30% of the total bridges constructed by VDOT, with 24% reached in 2007. VDOT is committed to the design of jointless bridges where practicable, within a clearly defined set of constraints based on the current state of the practice. It may be possible to consider a greater percentage of bridges for integral design through a better understanding of the field behavior.

Edition Notes

"June 2008"

Includes bibliographical references (p. 21-22).

Final report; July 2007-May 2008.

Also available online.

Sponsored by Virginia Department of Transportation and U.S. Federal Highway Administration 82085

Series
VTRC -- 08-R20, VTRC (Series) -- 08-R20.
Genre
Case studies.

Classifications

Library of Congress
TG325 .H67 2008

The Physical Object

Pagination
iii, 38 p. :
Number of pages
38

ID Numbers

Open Library
OL22563377M
LC Control Number
2008412275

History Created December 11, 2009 · 2 revisions Download catalog record: RDF / JSON

January 29, 2010 Edited by WorkBot add more information to works
December 11, 2009 Created by WorkBot add works page